Waves H

Waves V

Use this page to Create the Contexts for Migration Projects.

To access this page:

  1. Select dspMigrate in the Navigation pane, or select Console in the Context bar.
  2. Click Waves in the Navigation pane.

Waves V

Waves H

Use this page to Create the Contexts for Migration Projects.

Field

Description

Name

Displays the name of the Wave, which categorizes the migration project. Examples of Wave names include country names or specific work locations where the migration will be rolled out.

Description

Displays a description of the Wave.

ERP Settings

Target System

Displays the data source that contains the Target tables downloaded from the ERP system. This data source must be registered in Common  and the tables downloaded in Collect. Refer to Register a Data Source in Common for more information.

Multiple target systems can be added to a Wave. Refer to Add Multiple Target Systems at the Wave-Process Area Level for more information.

Client

Displays the ERP system client name. This value should match an entry in T000 and a single client should be used.

Language

Displays the ERP system language. This value should match an entry in T002 and is used to update the description of Target check table values.

Start Date

Displays the date that work on the migration for this wave begins. This date is used as a milestone by default in the Migration dashboard. Refer to Configure the IGC Migration Dashboard for more information.

NOTE: If there are multiple instances of the DSP, and a wave’s name, start and end dates are identical in multiple instances, data from only one wave displays on the dashboard.

End Date

Displays the date that work on the migration for this wave ends. This date is used as a milestone by default in the Migration dashboard. Refer to Configure the IGC Migration Dashboard for more information.

NOTE: If the current date is one month or later past this end date, the wave does not display on the dashboard.

NOTE: If there are multiple instances of the DSP, and a wave’s name, start and end dates are identical in multiple instances, data from only one wave displays on the dashboard.